200-Year Concrete, Re-vibration High-Density Concrete, JS/JPS Method
Introduction of case studies on re-vibration construction! Reducing cracks and increasing service life! Also contributes to total cost reduction.
Our "JS Method and JPS Method" is a new construction technique that enables simultaneous high-density concrete placement through re-vibration, aiming to reduce construction time, labor, and total costs while enhancing durability, lifespan, and the asset value of buildings. In our case studies, we clearly introduce the features of the "JS Method and JPS Method," as well as the differences from conventional methods and the construction process. 【Features】 ■ Significantly reduces cracking ■ Lower cost compared to conventional methods ■ Excellent delay effect against carbonation *For more details, please download the catalog. Feel free to contact us with any inquiries.
- Company:フロアエージェント
- Price:Other